services detail

Displacement Micropiles

Ground Improvement and Deep Foundation Experts

What is Drilled Displacement Micopiles

Drilled Displacement Micropiles use the traditional elements of Micropiles with reverse flighting welded to the steel shaft.  The DDM has a displacement head located near the tip of the steel core that helps displace soil during installation.  DDM are grouted during installation, creating an element with high friction and end bearing capacity.  Like Micropiles, DDM derives their structural capacity from the steel and the grout.

DDM are installed using a small excavator mounted with a hydraulic drill head in 20 ft. sections.  This is an advantage for DDM where similar capacity deep foundations would not have been feasible due to limited access, soil removal, and overhead room.

Benefits

Low vibration
Does not generate spoils
Can be installed in high water table
Can provide high lateral capacity
Can be installed in tight access and low overhead areas
Low mobilization cost and fast installation time

Applications

Applicable in areas where traditional piles cannot be installed
Can be installed in restricted access
Cost effective in Karst conditions
drilled shaft foundation contractors work

It's Time To Build...What to Expect

Geotek Design-Build will develop and provided a signed and sealed design detailing Displacement Micropiles plan.
Site clearing and access preparation will precede the Displacement Micropiles process. Typically prepared by site contractor.
Displacement Micropiles is generally performed under a performance specification, with specified minimum improvement criteria.
Grout slump and compressive strength to confirm grout quality.
Load testing can also be performed to verify pile capacity and settlement requirements.
After our work is completed and testing is done, Geotek Design-Build provide a certification package to allow final site grading and foundation construction to begin.

Process

The minimal equipment needed to install DDM presents a huge saving over traditional piles especially with mob/demob and rent of large drill rigs.  In addition, DDM presents a big advantage in a tight access environment.  Because DDM does not generate any spoils, it has an advantage over traditional piles especially in contaminated sites.

DDM’s are installed using hydraulic powered rotary equipment mounted on an excavator. The DDM is screwed into the ground with the help of crowd or downward pressure applied on the steel core.

During installation, a continuous flow of grout is provided at the top of the DDM that is drawn into the annulus created by the displacement head. Upon completion of pile installation, ensure that the grout level is brought to the top of the pile (inside and outside of the steel core). Following completion of installation and grouting, a pile cap is installed (if applicable).

DDM Are installed with low vibration that makes them a preferred deep foundation system near schools, hospitals, historic buildings, or any structure where vibration is a concern. As the pile is installed, the soil is laterally displaced, and no spoils are generated. This is very beneficial in contaminated sites and where the cost of spoil removal is a concern.

Design and Quality Control

The design of DDM included geotechnical and structural design of a single or a group of elements.  The structural connection between the DDM and the pile cap is typically handled by the structural engineer.

DDM develop their geotechnical capacity by friction between the grout and the soil and by end bearing if resting on hard stratum or rock.  The structural capacity of the element is carried out to ensure that applied stresses do not exceed the allowable stress of the steel and the grout.  The DDM can be designed to carry tension, compression, and lateral loads.

The size of DDM is dictated by the bearing stratum stiffness and the applied structure load.  The DDM displacement lead section includes a helicoidal driving plate, a lateral displacement plate, and a secondary deformation structure.  The driving plate helps advance the pile downward and provides end bearing support.  The lateral displacement plate creates a positive annulus around the steel core by displacing the soil outward.  The secondary deformation structure produces a ribbed or corrugation effect along the grouted pile shaft, greatly enhancing soil bond and load transfer.

During installation of all the DDM, the grout level is brought to the top of the pile at the inside and outside of the steel core.  The installation torque of each 5 feet segment is documented using in-house developed installation record tools.  Unlike Helical Piles, the capacity is not determined by installation torque and this data is used as reference only.  The performance and load-settlement behavior of the DDM is typically measured using a full-scale load test.

Visual Portfolio, Posts & Image Gallery for WordPress
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare